Avenhills, Church Stretton - 20th October

Energy-saving improvements

  • 'Big' insulation works
    'Big' insulation works
  • Glazing
    Glazing
  • Lighting systems and electrical appliances
    Lighting systems and electrical appliances
  • High spec heating
    High spec heating
  • Renewables: heat
    Renewables: heat
  • Renewables: electricity
    Renewables: electricity
  • Sustainable building materials
    Sustainable building materials

Location

Avenhills, Clive Avenue
Church Stretton
SHROPSHIRE
SY6 7BL

View on map

Opening times

Dates: Sunday 20th October
Opening times: 10am to 4pm

Property is on a steep hill, parking on Clive Avenue is limited so please park lower down and walk up if possible. Disabled parking or drop off available at house.

Just turn up

Property details

Rebuild of 1950s bungalow. Timber and part-oak framed detached property with tiled roof SIPP panels. 

What changes have been made?

 

Complete rebuild with renewable energy systems installed including an 8kW air source heat pump (ASHP), underfloor heating, solar photovoltaic (PV) panels and battery with capacities of 5.85kWp and 10kWh respectively.

 

What have been the approximate energy savings?

 

Without exporting any of the solar energy produced, we save about £1,000 a year. Exporting some energy saves us an extra £200.

 

For more information, please see attached PDF.

Additional information

(PDF, 117kB)

Location

Avenhills, Clive Avenue
Church Stretton
SHROPSHIRE
SY6 7BL

View on map

Opening times

Dates: Sunday 20th October
Opening times: 10am to 4pm

Property is on a steep hill, parking on Clive Avenue is limited so please park lower down and walk up if possible. Disabled parking or drop off available at house.

Just turn up

Other homes nearby

Part of the Green Open Homes network